Earthing & Lightning Protection System Projects
Since its formation, PETUNIA has involve in a main proportion of the domestic market.
Some of the major Earthing & lightening protection references are as followings:
Project Name | Year | Description | |
---|---|---|---|
1 | Earthing Material for Nouri Petrochemical Company- Namvaran Consulting Engineering , Managers Co. | 2023 | Manufacturing &Supply |
2 | Cheshmeh Khosh 230kv Substation & Overhead Line NGL3100 Feed and Product Pipelines & Inlet Facilities -Oil Industries Engineering and Construction (OIEC) | 2023 | Manufacturing &Supply |
3 | Lightning Material for 10mv Khaf Wind Farm- Nasb Niroo (Mapna Group) Co. | 2023 | Manufacturing &Supply |
4 | Colling Tower Earthing & Lightning System for Mehr Petro Kimia Petrochemical-Lirook Cooling Technology Co. | 2022 | Manufacturing &Supply |
5 | Earthing Material for Siraf Port, Pars (Phase XIII)- Petro Paydar Iranian Co. | 2022 | Manufacturing &Supply |
6 | Earthing Material for Persian Gulf Apadana Methanol-PIDEC Co. | 2022 | Manufacturing &Supply |
7 | Earthing Material for Dehloran Gas Compressor Station-Enerchimi Co. | 2022 | Manufacturing &Supply |
8 | Polkalleh Gas Compressor Station -Earthing & Lightning system - Radman | 2021 | Manufacturing &Supply |
9 | Earthing Material for Purchase of Hormozgan ground- IRITEC | 2021 | Manufacturing &Supply |
10 | GACHSARAN OLEFIN PROJECT (ASU UNIT) Earthing and Cable Accessory-Mashinsazi vizheh | 2021 | Manufacturing &Supply |
11 | Earthing System for Valve Station – Parsian Gas Refinery | 2020 | Manufacturing &Supply |
12 | Earthing System for Qeshm Refinery - Asfalt Tous | 2020 | Manufacturing &Supply |
13 | Earthing & Lightning Materials – Bushehr Petrochemical Company – MEG Plant Project CES Joint Venture | 2020 | Manufacturing &Supply |
14 | GILAN WATER TREATMENT PLANT | 2019 | Manufacturing &Supply |
15 | SANGAN MINING MINE | 2019 | Manufacturing &Supply |
16 | EARTHING & LIGHTNING SYSTEM OF DEY ARIYA POLIMER | 2019 | Manufacturing &Supply |
17 | AZAD DAM PROJECT | 2019 | Manufacturing &Supply |
18 | ASALOUYEH GAS CONDENSATE | 2019 | Manufacturing &Supply |
19 | TEHRAN-NORTH SUBWAY | 2019 | Manufacturing &Supply |
20 | KAVIR DAMGHAN STEEEL | 2019 | Manufacturing &Supply |
21 | SOUTH PARS GAS FIELD DEVELOPMENT PLAN PHASE 14 | 2019 | Manufacturing &Supply |
22 | EXPORT AND SERVICE PORT OF TOMBAK | 2019 | Engineering Design Manufacturing & Supply |
23 | EPCI SALMAN S1 WELLHEAD PLATFORM | 2018 | Manufacturing &Supply |
24 | THE 6TH LINE OF IRAN'S GAS TRANSMISSION | 2018 | Manufacturing &Supply |
25 | JONDI SHAPOUR PETROCHEMICAL | 2018 | Manufacturing &Supply |
26 | COPPER CONCENTRATION PROJECT IN ALOU KERMAN | 2018 | Manufacturing &Supply |
27 | EARTHING & LIGHTNING PROTECTION SYSTEM FOR ARVAND PETROCHEMICAL PROJECT | 2017 | Manufacturing &Supply |
28 | PARS HAYAT ERTHING PROJECT | 2017 | Manufacturing &Supply |
29 | JAHROM COMBINED CYCLE POWER PLANT | 2017 | Manufacturing &Supply |
30 | DANAN OIL FIELDS DEVELOPMENT | 2017 | Manufacturing &Supply |
31 | BANDAR ABBAS GAS CONDENSATE REFINARY | 2017 | Manufacturing &Supply |
32 | BANDAR ABBAS REFINERY GASOLINE PRODUCTION | 2017 | Manufacturing &Supply |
33 | ODORANT PRODUCTION UNIT 800 TPY | 2017 | Manufacturing &Supply |
34 | ESFAHAN OIL REFINERY UPGRADING AND REVAMPING PROJECT | 2016 | Manufacturing &Supply |
35 | PHASE 22-23 -24 SOUTH PARS | 2016 | Manufacturing &Supply |
36 | EARTHING SYSTEM | 2012 | Manufacturing &Supply |
37 | EARTHING SYSTEM (PHASES 13) | 2012 | Manufacturing &Supply |
38 | EARTHING SYSTEM (PHASES 14) | 2012 | Manufacturing &Supply |
39 | EARTHING SYSTEM (PHASES 17&18) | 2011 | Manufacturing &Supply |
40 | EARTHING SYSTEM (PHASES 12) | 2011 | Manufacturing &Supply |
41 | LIGHTNING SYSTEM (PHASES 15&16) | 2010 | Manufacturing &Supply |
42 | EARTHING SYSTEM FOR SHAZAND PETROCHEMICAL PROJECT | 2010 | Manufacturing &Supply |
43 | LIGHTNING SYSTEM (PHASES 17&18) | 2010 | Manufacturing &Supply |
44 | EARTHING TEMPORARY SYSTEM FOR SYRIA | 2010 | Manufacturing &Supply |
45 | EARTHING SYSTEM (PHASES 22&23&24) | 2010 | Manufacturing &Supply |
46 | EARTHING SYSTEM (PHASES 13) | 2010 | Manufacturing &Supply |
47 | EARTHING SYSTEM (PHASES 17&18) | 2010 | Manufacturing &Supply |
48 | OROUMIYEH GAS POWER HOUSE | 2009 | Manufacturing &Supply |
49 | SOUTH PARS, GAS FIELD DEVELOPMENT PHASES 15& 16 | 2009 | Manufacturing &Supply |
50 | SOUTH PARS, PHASES 12 | 2009 | Manufacturing &Supply |
51 | SHAZAND ARAK REFINERY 2260-1-2-0603 | 2009 | Manufacturing &Supply |
52 | ILAM PETROCHEMICAL COMPLEX | 2009 | Manufacturing &Supply |
53 | EARTING SYSTEM FOR SHAZAND PETRO CHEMICAL PROJECT | 2009 | Manufacturing &Supply |
54 | EARTING SYSTEM FOR JAMI BADRAANLOO & FAROOJ PROJECT | 2009 | Manufacturing &Supply |
55 | EARTHING SYSTEM (15&16) | 2009 | Manufacturing &Supply |
56 | NF3 PLANT OF BIPC | 2008 | Manufacturing &Supply |
57 | SVC FOOLAD MOBARAKEH | 2008 | Manufacturing &Supply |
58 | FOOLAD HORMOZGAN EARTH SYSTEM | 2008 | Manufacturing &Supply |
59 | MOBIEN PETROCHEMICAL | 2008 | Manufacturing &Supply |
60 | EARTH SYSTEM & LIGHTNING PROTECTION OIL SQUARES OF SARVESTAN & SAADAT ABAD | 2008 | Manufacturing &Supply |
61 | HORMOZGAN POWER PLANT | 2008 | Manufacturing &Supply |
62 | REFINERY BANDAR ABBAS | 2008 | Manufacturing &Supply |
63 | ROUDSHAHR POWER HOUSE | 2007 | Manufacturing &Supply |
64 | ZOB FOOLAD IRAN | 2007 | Manufacturing &Supply |
65 | AMIR KABIR PETROCHEMICAL | 2007 | EP : Engineering Design Manufacturing &Supply Material |
66 | ASALOOYEH POWER PLANT | 2007 | Manufacturing &Supply |
67 | ARDEBIL POWER PLANT | 2007 | Manufacturing &Supply |
68 | PARS POWER PLANT | 2007 | Manufacturing &Supply |
69 | SYMAN SHAHREKORD | 2007 | Manufacturing &Supply |
70 | IRAN KHODRO SAZEH | 2007 | Manufacturing &Supply |
71 | SOUTH PARS GAS POWER PLANT | 2007 | Manufacturing &Supply |
72 | DAMAVAND POWER PLANT | 2007 | Manufacturing &Supply |
73 | EARTHING SYS., 6,7,8 PHASES | 2007 | Manufacturing &Supply |
74 | ILAM PETROCHEMICAL | 2007 | Manufacturing &Supply |
75 | FAJR PETROCHEMICAL | 2007 | Manufacturing &Supply |
76 | PETROCHEMICAL AMIR KABIR | 2007 | Manufacturing &Supply |
77 | SHAHRE KORD CEMENT | 2007 | Manufacturing &Supply |
78 | DAMAVAND COMBINATIVE CYCLE | 2007 | Engineering Design Manufacturing & Supply |
79 | YAZD POWER PLANT | 2006 | Manufacturing &Supply |
80 | ROUDSHOUR POWER PLANT | 2006 | Manufacturing &Supply |
81 | GHOM EARTHING STATION | 2006 | Manufacturing &Supply |
82 | HARAT SUBSTATION | 2006 | Manufacturing &Supply |
83 | AFGHANISTAN EQUIPMENT EARTH SYSTEM | 2006 | Manufacturing &Supply |
84 | ASALOOYEH 6,7,8 PHASES | 2006 | Manufacturing &Supply |
85 | PARAND GAS POWER PLANT | 2006 | Manufacturing &Supply |
86 | AIR SEPARATION UNIT-2 | 2006 | Manufacturing &Supply |
87 | JAM PETROCHEMICAL | 2006 | Manufacturing &Supply |
88 | MASHHAD POWER PLANT | 2006 | Manufacturing &Supply |
89 | NEKA POWER PLANT | 2006 | Manufacturing &Supply |
90 | GHAEM REFINERY POWER PLANT | 2006 | Manufacturing &Supply |
91 | SIMAN BOJNURD | 2006 | Manufacturing &Supply |
92 | ARYASASOL PETROCHEMICAL POLYETHYLENE | 2006 | Manufacturing &Supply |
93 | KHORRAMSHAHR DEVELOPMENT OF OIL | 2006 | Manufacturing &Supply |
94 | PARSIAN EMERGENCY STATION STRENGTHENING GAS PRESSURE | 2006 | Manufacturing &Supply |
95 | ARYASASOL POLYMER | 2006 | Manufacturing &Supply |
96 | MONTAZER GHAEM POWER HOUSE REFINERY | 2006 | Manufacturing &Supply |
97 | ABADAN SETTLING INDUSTRIAL SEWAGE | 2006 | Manufacturing &Supply |
98 | HEGMATAN PETROCHEMICAL SUBSTATION | 2006 | Manufacturing &Supply |
99 | ROUDSHOUR POWER PLANT | 2005 | Manufacturing &Supply |
100 | YAZD LIGHTNING PROTECTION SITE,OLD KAZERUN PROTECTION SITE, MOBIN PROJECT | 2005 | Manufacturing &Supply |
101 | MILAD TOWER | 2005 | Manufacturing &Supply |
102 | SHAHRIAR IRON PROTECTION | 2005 | Manufacturing &Supply |
103 | PARS PETROCHEMICAL | 2005 | Manufacturing &Supply |
104 | SOUTH PARS 6,7,8 | 2005 | Manufacturing &Supply |
105 | LAVAN OIL REFINERY RLL-840403-LA | 2005 | Manufacturing &Supply |
106 | RAFSANJAN INDUSTRIAL GROUP | 2005 | Manufacturing &Supply |
107 | ABIEK CEMENT | 2005 | Manufacturing &Supply |
108 | JAM PETROCHEMICAL BUILDING | 2005 | Manufacturing &Supply |
109 | KERMANSHAH PETROCHEMICAL | 2005 | Manufacturing &Supply |
110 | ROUDSHUR POWER HOUSE | 2005 | Manufacturing &Supply |
111 | BOYER AHMAD SUBSTATION132/33KV | 2005 | Manufacturing &Supply |
112 | SOUTH PARS PHASE 6-7-8 | 2005 | Manufacturing &Supply |
101 | SOUTH PARS PHASE 6-7-8-PARTS C6&C7 | 2005 | Manufacturing &Supply |
113 | LOT 2.1 AND LOT 2.3 | 2004 | Manufacturing &Supply |
114 | UREA & AMMONIAC PLANT | 2004 | Manufacturing & Supply Material Exaction & Commissioning |
115 | MAROON FIELD DEVELOPMENT | 2004 | Engineering Design Manufacturing & Supply |
116 | ESFAHAN STEEL REFINERY CENTRAL P.P. | 2004 | Manufacturing &Supply |
117 | FERRO CHROME SABZEVAR | 2004 | Manufacturing &Supply |
118 | LIGHT POLYETHYLENE ARYASASOL | 2004 | Engineering Design Manufacturing & Supply |
119 | MAHSHAHR NON INDUSTRIAL SITE | 2004 | Engineering Design Manufacturing & Supply |
120 | LIGHT POLYETHYLENE ARYASASOL | 2004 | Engineering Design Manufacturing & Supply |
121 | ESHGH ABAD TABAS S/S | 2004 | Manufacturing &Supply |
122 | LLDPE-AMIR KABIR PETROCHEMICAL CO | 2004 | Engineering Design Manufacturing & Supply |
123 | AGHA JARI GAS INJECTION | 2004 | Manufacturing &Supply |
113 | (PO-4-EL-852) LAB - BISOTOON PETROCHEMICAL CO. | 2004 | Manufacturing &Supply |
124 | KHARK STORAGE TANKS | 2003 | Manufacturing & Supply Material Exaction & Commissioning |
125 | DUBAI SAFE WAY CO | 2002 | Manufacturing &Supply |
126 | KHARK PETROCHEMICAL PLANT STORAGE TANKS | 2002 | Engineering Design & Supervisor |
127 | MAH SHAHR MTBE PLANT (BIPC) | 2002 | Manufacturing &Supply |
128 | IMAM PORT PETROCHEMICAL | 2002 | Engineering Design Manufacturing & Supply |
129 | SECOND ATTACHMENT OF AMIR KABIR PETROCHEMICAL PLANT | 2002 | Engineering Design Manufacturing & Supply |
130 | TABRIZ PETROCHEMICAL PLANT | 2002 | Engineering Design Manufacturing & Supply |
131 | ABU DHABI PROJ. | 2001 | Manufacturing &Supply |
132 | ZAHEDAN & ZABOL WATER TRANSMISSION PIPELINE | 2001 | Engineering Design |
133 | BANDAB ZAHEDAN & ZABOL WATER TRANSMISSION PIPELINE | 2001 | Engineering Design |
134 | BOUSHEHR CEMENT PRO. | 2001 | Manufacturing &Supply |
135 | TABRIZ BOOTADIN PROJECT | 2001 | Manufacturing &Supply |
136 | SOUTH PARS 1 | 2001 | Manufacturing &Supply |
137 | KHOY POWER PLANT | 2001 | Manufacturing &Supply |
138 | KAROON POWER PLANT | 2001 | Engineering Design Manufacturing & Supply |
139 | AMIR KABIR BOOTADIN | 2001 | Engineering Design Manufacturing & Supply |
140 | AMIR KABIR PETROCHEMICAL | 2001 | Engineering Design Manufacturing & Supply |
141 | ARMENIA SUBSTATION PROJECT | 2001 | Engineering Design Manufacturing & Supply |
142 | KERMAN POWER PLANT | 2001 | Manufacturing &Supply |
143 | 3RD IMAM METANOL SEA PORT | 2001 | Engineering Design Manufacturing & Supply |
144 | MASJED SOLEIMAN DAM | 2001 | Engineering Design Manufacturing & Supply |
145 | ZAHEDAN WATER LINE PROJECT | 2001 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
146 | CRYSTAL MELAMINE KHORASAN | 2001 | Engineering Design Manufacturing & Supply |
147 | KAZEROON 2 SUBSTATION | 2001 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
148 | ZABOL WATER PIPE LINE PROJECT | 2001 | Engineering Design Manufacturing & Supply |
149 | KARKHEH POWER PLANT | 2001 | Engineering Design Manufacturing & Supply |
150 | I.R.I RAILWAY PRO. | 2000 | Manufacturing &Supply |
151 | UNIT 7-8 RAMIN POWER STATION | 2000 | Engineering Design |
152 | ABUZAR OFFSHORE PLATFORM | 2000 | Engineering Design Manufacturing & Supply |
153 | RAZI PETROCHEMICAL PRO. | 2000 | Manufacturing &Supply |
154 | KAROUN 3 SUBSTATION & POWER PLANT | 2000 | Manufacturing &Supply |
155 | NEKA & ALAMDEH SUBSTATION 230/63/ KV | 2000 | Manufacturing &Supply |
156 | KHARG METHANOL PRODUCTION COMPLEX | 2000 | Manufacturing &Supply |
157 | ISFAHAN DEFENSE INDUSTRY SUBSTATION | 2000 | Manufacturing &Supply |
158 | IMAM KHOMEINI AIRPORT | 2000 | Manufacturing &Supply |
159 | BANDAR IMAM PETROCHEMICAL PRO. | 2000 | Manufacturing &Supply |
160 | ABADAN?KHORRAMSHAHR WATER NETWORK | 2000 | Manufacturing &Supply |
161 | RAYSOOT POWER PLANT | 1999 | Engineering Design Manufacturing & Supply |
162 | TURKMENISTAN PRO. | 1999 | Engineering Design Manufacturing & Supply |
163 | INTERFACE OF KARKHE DAM | 1999 | Manufacturing &Supply |
164 | KAROUN 3 | 1999 | Manufacturing &Supply |
165 | ARAK PETROCHEMICAL PLANT | 1998 | Manufacturing &Supply |
166 | MASJED SOLEIMAN SURE GAS PROJECT | 1998 | Manufacturing &Supply |
167 | MTBE PLANT | 1998 | Manufacturing &Supply |
158 | MONTAZER GHAYEM POWER PLANT | 1998 | Manufacturing & Supply Material Exaction & Commissioning |
169 | 400 KV SHOSHTAR SUBSTATION | 1997 | Engineering Design Manufacturing & Supply |
170 | KHARK PETROCHEMICAL | 1997 | Manufacturing &Supply |
171 | ISTAHBAN CEMENT PRO. | 1997 | Manufacturing & Supply Material Exaction & Commissioning |
172 | BANDAR ABBAS REFINERY PUMP STATION | 1997 | Engineering Design Manufacturing & Supply |
173 | 14 SUBSTATION SETS OF MASKAN | 1997 | Engineering Design Manufacturing & Supply |
174 | TEHRAN TOWER PRO. | 1997 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
175 | SHAHROOD CEMENT PRO. | 1997 | Engineering Design Manufacturing & Supply |
176 | KAROON 1 POWER PLANT | 1997 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
177 | EXPANSION OF ISLAM-ABAD 230 KV SUBSTATION | 1997 | Engineering Design Manufacturing & Supply |
178 | BOUSHEHR ATOMIC PLANT | 1997 | Manufacturing &Supply |
179 | BAKHTAR POWER PLANT SH. MOFATEH 230/63 KV | 1997 | Engineering Design Manufacturing & Supply |
180 | AL MEHDY ALUMINUM IND. | 1996 | EP: Engineering Design Manufacturing &Supply Material |
181 | 230 KV SUBSTATION FOR ARAK POWER PLANT | 1996 | Manufacturing &Supply |
182 | KERENG NGL-1500 GAS INJECTION | 1996 | EP: Engineering Design Manufacturing &Supply Material |
183 | ISFAHAN OIL REFINERY | 1996 | EPC EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
184 | SEVEN SUBSTATION OF FARS STATE | 1996 | EP: Engineering Design Manufacturing &Supply Material |
185 | ARAK PETROCHEMICAL PRO. | 1996 | EP: Engineering Design Manufacturing &Supply Material |
186 | PARSI GAS INJECTION PRO. | 1996 | Manufacturing &Supply |
187 | HORMOZGAN CEMENT PRO. | 1996 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
188 | KARKHE DAM PLANT | 1996 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
189 | BANDAR ABBAS OFFSHORE PLATFORM | 1996 | Manufacturing & Supply Material Exaction & Commissioning |
190 | ILAM CEMENT PRO. | 1996 | Manufacturing & Supply Material Exaction & Commissioning |
191 | SPORT SALOON OF ALESTOM POWER PLANT | 1996 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
192 | GACHSARAN GAS INJECTION PRO. | 1996 | Manufacturing &Supply |
193 | REPAIR OF A SUBSTATION IN ABADAN | 1995 | EP : Engineering Design Manufacturing &Supply Material |
194 | THREE SUBSTATIONS IN SISTAN AND BLUCHESTAN STATE. | 1995 | EP : Engineering Design Manufacturing &Supply Material |
195 | CHABAHAR OFFICE OF FREE ZONE | 1995 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
196 | SARCHESHME COPPER INDUSTRY | 1995 | PC Manufacturing & Supply Material Exaction & Commissioning |
197 | TABRIZ PETROCHEMICAL PRO. | 1995 | EP: Engineering Design Manufacturing &Supply Material |
198 | GOL E GOHAR IRAN ORE PRO. | 1995 | EP: Engineering Design Manufacturing &Supply Material |
199 | GILAN POWER PLANT | 1995 | EP: Engineering Design Manufacturing &Supply Material |
200 | 400 KV SUBSTATION OF GHARB STATE | 1995 | Manufacturing &Supply |
201 | MASHIN SAZI ARAK SUBSTATION | 1995 | EP: Engineering Design Manufacturing &Supply Material |
202 | KHOZESTAN CEMENT PRO. | 1995 | PC Manufacturing & Supply Material Exaction & Commissioning |
203 | ABUZAR OFFSHORE PLATFORM | 1994 | EP: Engineering Design Manufacturing &Supply Material |
204 | RASHT WATER NETWORK | 1994 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
205 | TEHRAN OFFICE OF TRAFFIC CONTROL | 1994 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
206 | KHATAM OL ANBIA HOSPITAL | 1993 | EPC Work comprising: Engineering Design Manufacturing &Supply Material Exaction & Commissioning |
207 | 132 KV SORMOGH SUBSTATION | 1993 | EP : Engineering Design Manufacturing &Supply Material |